{"id":4090,"date":"2020-11-11T11:33:02","date_gmt":"2020-11-11T11:33:02","guid":{"rendered":"https:\/\/www.becgroup.com\/project\/injection-moulding-for-the-channel-tunnel\/"},"modified":"2023-02-09T12:28:07","modified_gmt":"2023-02-09T12:28:07","slug":"injection-moulding-for-the-channel-tunnel","status":"publish","type":"project","link":"https:\/\/www.becgroup.com\/project\/injection-moulding-for-the-channel-tunnel\/","title":{"rendered":"Injection moulding for the Channel Tunnel"},"content":{"rendered":"<h2><b>Project:<\/b> Custom-designed heavy-duty cleat liner<\/h2>\n<p><strong>Services:<\/strong><br \/>\n<a href=\"https:\/\/www.becgroup.com\/what-we-do\/design\/design-for-manufacture\/\">Design for manufacture<\/a>, injection mould tool design, production tooling, material selection, <a href=\"https:\/\/www.becgroup.com\/what-we-do\/moulding\/plastic-injection-moulding\/\">plastic injection moulding<\/a> and rapid tooling.<\/p>\n<p><b>Our Client:<\/b><br \/>\nA large OEM who were commissioned by ElecLink, which was a large Channel Tunnel Project in 2018.<\/p>\n<p><strong>Our Mission:<br \/>\n<\/strong>To produce cable liners to support new power cables for a new electricity interconnector between the UK and France, inside the Channel Tunnel. Up against very tight timescales and stiff competition, we were the only manufacturer to provide injection mould tool design through to production tooling <a href=\"https:\/\/www.becgroup.com\/about\/\">in-house<\/a>, including small batch sampling to facilitate modifications before starting full production.<strong><br \/>\n<\/strong><\/p>\n<p><strong>Our Solution:<\/strong><\/p>\n<p>The BEC team out-did themselves on this one, demonstrating their fabulous teamwork, commitment, determination, flexibility and sheer hard work! Overcoming every one of the challenges brought on by the sheer scale of this hugely exciting project \u2013 one of the most intense in our history!<\/p>\n<p>Involved from the outset we were able to fully comprehend the entire supply chain and appreciate the timescales, complexity and pressure to overcome multiple problems; mould tool design, <a href=\"https:\/\/www.becgroup.com\/what-we-do\/tooling\/repairs-and-modifications\/\">modifying the tool<\/a>, properties of the material, variations in thickness and responding quickly to varying test reactions, keeping the client regularly updated on this extremely time-critical Channel Tunnel project.<\/p>\n<p>During the <a href=\"https:\/\/www.becgroup.com\/what-we-do\/design\/design-for-manufacture\/\">Design for Manufacture<\/a> process, it became necessary to adjust a component to reduce cycle times to meet the unchangeable timelines. As well as supplying rapid prototypes for short-circuit testing and increasing production capacity by increasing machinists\u2019 shift patterns.<br \/>\nBy offering the flexibility and capability to set up 6 months\u2019 worth of dedicated production time, we were able to provide many solutions including:<\/p>\n<p>\u2022 Designing the injection mould tool to meet specific material requirements including; flame retardancy to EN5454, low smoke and fume risk, shore hardness and all at the right price<br \/>\n\u2022 Produce a fully automatic injection mould tool<br \/>\n\u2022 Design and develop a <a href=\"https:\/\/www.becgroup.com\/what-we-do\/tooling\/injection-mould-tooling\/\">mould too<\/a>l to run quickly enough to produce 6k mouldings per week, incorporating air-ejection and water-cooling channels to reduce cycle times and allow greater tool temperature control<br \/>\n\u2022 Stand-alone refrigeration unit to keep water temperature controlled<br \/>\n\u2022 Store in a dedicated unit to ensure we could call off required quantities as and when.<\/p>\n<p><strong>Result:<\/strong><\/p>\n<p>Literally overnight, with the autonomy, capacity and scope, we set up a dedicated 24-hour production run. This ran 5 days a week, and, recruiting a full night shift specifically for the project, we produced the required 6,000 per week. That\u2019s a whopping 150,000 mouldings in total!<\/p>\n<p>We designed and manufactured the following mould tools:<br \/>\n\u2022 3d printed parts for testing<br \/>\n\u2022 Single cavity injection mould tool, hot sprue with direct injection, pin and air assisted ejection and machine finish. Our customer originally requested a prototype tool but because we exceeded lead times a testing only tool wasn\u2019t needed, saving both time and money.<\/p>\n<p>The two direct current cables inside the Channel Tunnel enable the electricity produced, on either side of the Channel, to circulate between the two countries as needed.<\/p>\n<p><strong>We can help with all aspects of your plastic injection moulded products.\u00a0 From designing your next mould tool, to making it, testing it and running off samples before going into full production.\u00a0 Proud to offer the flexibility to scale up or down to suit you.\u00a0 Simply give us a call on <\/strong><a href=\"tel:441425613131\">(0)1425 613 131<\/a> or email <a href=\"mailto:hello@becgroup.com\">hello@becgroup.com<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Project: Custom-designed heavy-duty cleat liner Services: Design for manufacture, injection mould tool design, production tooling, material selection, plastic injection moulding and rapid tooling. Our Client: A large OEM who were commissioned by ElecLink, which was a large Channel Tunnel Project in 2018. Our Mission: To produce cable liners to support new power cables for a new electricity interconnector between the UK and France, inside the Channel Tunnel. Up against very tight timescales and stiff competition, we were the only manufacturer to provide injection mould tool design through to production tooling in-house, including small batch sampling to facilitate modifications before starting full production. Our Solution: The BEC team out-did themselves on this one, demonstrating their fabulous teamwork, commitment, determination, flexibility and sheer hard work! Overcoming every one of the challenges brought on by the sheer scale of this hugely exciting project &hellip; <a href=\"https:\/\/www.becgroup.com\/project\/injection-moulding-for-the-channel-tunnel\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"featured_media":2055,"parent":0,"template":"","meta":{"footnotes":""},"project_category":[4],"class_list":["post-4090","project","type-project","status-publish","has-post-thumbnail","hentry","project_category-plastic-injection-moulding"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.6 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Injection moulding for the Channel Tunnel - BEC Group<\/title>\n<meta name=\"description\" content=\"BEC designed and made the injection mould tool for the cleat strap for the Channel Tunnel project. 6,000 mouldings per week..\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.becgroup.com\/project\/injection-moulding-for-the-channel-tunnel\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Injection moulding for the Channel Tunnel - BEC Group\" \/>\n<meta property=\"og:description\" content=\"BEC designed and made the injection mould tool for the cleat strap for the Channel Tunnel project. 6,000 mouldings per week..\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.becgroup.com\/project\/injection-moulding-for-the-channel-tunnel\/\" \/>\n<meta property=\"og:site_name\" content=\"BEC Group\" \/>\n<meta property=\"article:modified_time\" content=\"2023-02-09T12:28:07+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.becgroup.com\/wp-content\/uploads\/2020\/09\/Jointing-Tech-3-scaled-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1704\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@becgroup\" \/>\n<meta name=\"twitter:label1\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Injection moulding for the Channel Tunnel - BEC Group","description":"BEC designed and made the injection mould tool for the cleat strap for the Channel Tunnel project. 6,000 mouldings per week..","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.becgroup.com\/project\/injection-moulding-for-the-channel-tunnel\/","og_locale":"en_GB","og_type":"article","og_title":"Injection moulding for the Channel Tunnel - BEC Group","og_description":"BEC designed and made the injection mould tool for the cleat strap for the Channel Tunnel project. 6,000 mouldings per week..","og_url":"https:\/\/www.becgroup.com\/project\/injection-moulding-for-the-channel-tunnel\/","og_site_name":"BEC Group","article_modified_time":"2023-02-09T12:28:07+00:00","og_image":[{"width":2560,"height":1704,"url":"https:\/\/www.becgroup.com\/wp-content\/uploads\/2020\/09\/Jointing-Tech-3-scaled-1.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_site":"@becgroup","twitter_misc":{"Estimated reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.becgroup.com\/project\/injection-moulding-for-the-channel-tunnel\/","url":"https:\/\/www.becgroup.com\/project\/injection-moulding-for-the-channel-tunnel\/","name":"Injection moulding for the Channel Tunnel - BEC Group","isPartOf":{"@id":"https:\/\/www.becgroup.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.becgroup.com\/project\/injection-moulding-for-the-channel-tunnel\/#primaryimage"},"image":{"@id":"https:\/\/www.becgroup.com\/project\/injection-moulding-for-the-channel-tunnel\/#primaryimage"},"thumbnailUrl":"https:\/\/www.becgroup.com\/wp-content\/uploads\/2020\/09\/Jointing-Tech-3-scaled-1.jpg","datePublished":"2020-11-11T11:33:02+00:00","dateModified":"2023-02-09T12:28:07+00:00","description":"BEC designed and made the injection mould tool for the cleat strap for the Channel Tunnel project. 6,000 mouldings per week..","breadcrumb":{"@id":"https:\/\/www.becgroup.com\/project\/injection-moulding-for-the-channel-tunnel\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.becgroup.com\/project\/injection-moulding-for-the-channel-tunnel\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.becgroup.com\/project\/injection-moulding-for-the-channel-tunnel\/#primaryimage","url":"https:\/\/www.becgroup.com\/wp-content\/uploads\/2020\/09\/Jointing-Tech-3-scaled-1.jpg","contentUrl":"https:\/\/www.becgroup.com\/wp-content\/uploads\/2020\/09\/Jointing-Tech-3-scaled-1.jpg","width":2560,"height":1704,"caption":"BEC Group Injection Moulded Cable Ties"},{"@type":"BreadcrumbList","@id":"https:\/\/www.becgroup.com\/project\/injection-moulding-for-the-channel-tunnel\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.becgroup.com\/"},{"@type":"ListItem","position":2,"name":"Injection moulding for the Channel Tunnel"}]},{"@type":"WebSite","@id":"https:\/\/www.becgroup.com\/#website","url":"https:\/\/www.becgroup.com\/","name":"BEC Group","description":"","publisher":{"@id":"https:\/\/www.becgroup.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.becgroup.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/www.becgroup.com\/#organization","name":"BEC Group","url":"https:\/\/www.becgroup.com\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.becgroup.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.becgroup.com\/wp-content\/uploads\/2022\/03\/BEC-Organisation-logo.jpg","contentUrl":"https:\/\/www.becgroup.com\/wp-content\/uploads\/2022\/03\/BEC-Organisation-logo.jpg","width":1000,"height":1000,"caption":"BEC Group"},"image":{"@id":"https:\/\/www.becgroup.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/x.com\/becgroup","https:\/\/www.linkedin.com\/company\/becgroupuk\/"]}]}},"_links":{"self":[{"href":"https:\/\/www.becgroup.com\/wp-json\/wp\/v2\/project\/4090","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.becgroup.com\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/www.becgroup.com\/wp-json\/wp\/v2\/types\/project"}],"version-history":[{"count":7,"href":"https:\/\/www.becgroup.com\/wp-json\/wp\/v2\/project\/4090\/revisions"}],"predecessor-version":[{"id":4680,"href":"https:\/\/www.becgroup.com\/wp-json\/wp\/v2\/project\/4090\/revisions\/4680"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.becgroup.com\/wp-json\/wp\/v2\/media\/2055"}],"wp:attachment":[{"href":"https:\/\/www.becgroup.com\/wp-json\/wp\/v2\/media?parent=4090"}],"wp:term":[{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/www.becgroup.com\/wp-json\/wp\/v2\/project_category?post=4090"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}